Cabling Spaghetti Slide 11

Nov. 28, 2012

Attribution: By Achim Hering (Own work) [GFDL or CC-BY-3.0], via Wikimedia Commons

Point Tupper, Nova Scotia coal fired power plant, Unit 1 control room cabinets, behind wall control panel

The holes are woefully undercapped by the plate, “ensuring that fire and smoke will immediately spread between rooms,” notes Hering – and underlining the need for T ratings for cable penetration.

<<<PREV12345678910 11 12NEXT>>>>

Sponsored Recommendations

Power up your system integration with Pulse Power - the game-changing power delivery system

May 10, 2023
Pulse Power is a novel power delivery system that allows System Integrators to safely provide significant power, over long distances, to remote equipment. It is a Class 4 power...

Network Monitoring- Why Tap Modules?

May 1, 2023
EDGE™ and EDGE8® tap modules enable passive optical tapping of the network while reducing downtime and link loss and increasing rack space utilization and density. Unlike other...

400G in the Data Center

Aug. 3, 2022
WHATS NEXT FOR THE DATA CENTER: 400G and Beyond

The Agile and Efficient Digital Building

May 9, 2023
This ebook explores how intelligent building solutions can help businesses improve network infrastructure management and optimize data center operations in enterprise buildings...