One day versus everyday


Jan 1, 2009

One summer, I worked as an attendant at a convenience-store/gas-station chain. My duties were pumping gas and ensuring some parts of the convenience store remained stocked. As a low-level employee, I had a seemingly endless list of superiors. I had a supervisor who was the head gas-pumper/shelf-stocker. He answered to the store manager. The store manager answered to a regional manager who answered to a district manager. Or maybe the district manager answered to theregional manager. I can't remember.

Anyway, one day the regional manager (or maybe it was the district manager) was supposed to pay a visit to the store. You should have seen how the place operated that day; we went through more Windex and Spic'n'Span in one shift than we did the rest of the summer. Everything had to be in the best possible shape because apparently the store was going to receive a grade from the regional/district manager.

Unfortunately, I can't tell you the rest of the story because I wasn't there when the person handing out the grades showed up. All I can say is that the store's staff remained intact throughout the summer, so we must have done OK.

What became evident even to a naïve kid like me was the grade we got that day did not represent everyday reality. It represented our absolute best effort for a very short period of time. Unfortunately, that's exactly the phenomenon some of you might be experiencing as users of structured cabling systems.

A recent report from the Communications Cable and Connectivity Association said that cables purchased off distributor shelves failed to meet the electrical- and flame-resistance performance they claimed on theirouter jackets. The CCCA has been quick to point out the brands are not prominent in North America, and each of the cables was made by an offshore manufacturer.

But the deeper question is: Did these cables ever really pass CMP/CMR and electrical-performance tests, and receive third-party lab recognition of that performance? If so, then on the day these manufacturers produced the cable to be tested, they acted as if the district manager was paying a visit. Everything from materials to processes was buttoned up tightly for one day. Then they went back to their normal routine of far-less-strict practices. On the otherhand, if they never went through such testing, then these manufacturers are fraudulently portraying that they did.

We're tracking this story now and will have more details next month, as well as on www.cablinginstall.com.

PATRICK McLAUGHLIN
Chief Editor
patrick@pennwell.com


We Recommend

Skeletons in the telecom closet: The 10 scariest things I've seen this year

The 11 biggest cabling stories of 2011

Free app calculates loss budget

Reference poster dissects 802.11n

Fiber installation courses available online

Counterfeit cable exposed

Making the switch from 62.5- to 50-micron fiber

Telecom grounding and bonding standard published by NECA and BICSI

Free poster highlights 10 fiber-safety rules


Most Popular Articles
Top Blog Posts

TIA sets objectives for 40G over twisted pair

Cancer patients miss surgery due to cable theft

Cable tech finds 500-pound bear in customer’s basement

Nearly-electrocuted copper-cable thief speaks remorsefully

House explosions, captured on video, blamed on cable theft

Modified U.S. Army drone spies on WiFi users

Turn a wiring cabinet into a liquor cabinet


Receive Free E-mail Newsletters from Cabling Installation & Maintenance

Want to hear about more articles like this one? Sign up for our free email newsletters.



Email:

First Name:

Last Name:

Promo Code (optional):

Country:

Available Newsletters:
Cabling News

Data Centers Report

Contractor Report

 


Cabling Installation & Maintenance Topic and Resource Categories:

Data CentersCabling Standards
Network CableConnectivity Technologies
Network ProtocolsIP Convergence
WirelessDesign, Installation & Testing
Current IssueArchives
Cabling BlogBuyer's Guide