Implementing a centralized optical-fiber cabling system - Cabling Installation & Maintenance

Implementing a centralized optical-fiber cabling system


Jan 1, 1997

Todd Harpel,

Hubbell Premise Wiring Inc.

Problem

As fiber becomes more popular for horizontal cabling, cabling installers and cable-plant managers are centralizing the electronics that supports users on multiple floors. The problem is to create a centralized optical-fiber cabling system using 62.5/125-micron multimode fiber that is standards-compliant and will support future multigigabit services.

Solution

According to TIA`s TSB-72, centralized optical-fiber cabling can be implemented by providing a direct connection from work areas on each floor to the centralized (or main) crossconnect.

The maximum horizontal cabling distance from the telecommunications closet (TC) to the work area remains 90 meters (295 feet). The combined length of the horizontal and intrabuilding backbone cable, as well as the patch cords, however, can extend to 300 meters (984 ft). Enough slack must be left conversion to standard star-wired horizontal and backbone systems. The TSB permits three methods for implementing this centralized system. Of these, the interconnect method allows the greatest flexibility to ease future conversion.

Procedure

Pull the horizontal cabling to each work area from a TC on the same floor following the procedures in Section 4 of tia/eia-568a.

1) Terminate each end of the horizontal cable with ST or SC connectors.

2) Mount a patch panel in the TC in a way that will allow an additional patch panel to easily be added adjacent to it at a later date without disturbing other cabling.

3) Connect the TC end of the horizontal cable to the front or user side of the patch panel, ensuring that the correct bend radius is maintained and proper strain relief is provided.

4) Leave enough cable slack in the horizontal cables to allow them to be disconnected from this patch panel and plugged into the back or technician`s side of a new patch panel.

5) Install a 62.5/125-micron multimode optical-fiber backbone cable from each TC to the main crossconnect, following the procedures in Section 5 of tia/eia-568a.

6) The backbone cable to each TC must contain enough strands to provide each work area terminating in that closet with two strands, as well as additional strands for future growth.

7) Terminate each strand in the backbone cable with ST or SC connectors.

8) Connect the TC ends to the back of the patch panel where the horizontal cables are connected in each TC.

9) Connect the other ends of each backbone cable to the back or technician`s side of patch panels in the central crossconnect.

10) Label the ports of the patch panels in the central cross connect with the station number and floor according to the procedures outlined in tia/eia-606.

Click here to enlarge image

TIA`s TSB-72 specifies both the horizontal and backbone lengths for a centralized optical-fiber cabling system.

Todd Harpel, rcdd, is technical services manager at Hubbell Premise Wiring Inc. (Stonington, CT).


We Recommend

Skeletons in the telecom closet: The 10 scariest things I've seen this year

The 11 biggest cabling stories of 2011

Free app calculates loss budget

Reference poster dissects 802.11n

Fiber installation courses available online

Counterfeit cable exposed

Making the switch from 62.5- to 50-micron fiber

Telecom grounding and bonding standard published by NECA and BICSI

Free poster highlights 10 fiber-safety rules


Most Popular Articles
Top Blog Posts

TIA sets objectives for 40G over twisted pair

Cancer patients miss surgery due to cable theft

Cable tech finds 500-pound bear in customer’s basement

Nearly-electrocuted copper-cable thief speaks remorsefully

House explosions, captured on video, blamed on cable theft

Modified U.S. Army drone spies on WiFi users

Turn a wiring cabinet into a liquor cabinet


Receive Free E-mail Newsletters from Cabling Installation & Maintenance

Want to hear about more articles like this one? Sign up for our free email newsletters.



Email:

First Name:

Last Name:

Promo Code (optional):

Country:

Available Newsletters:
Cabling News

Data Centers Report

Contractor Report

 


Cabling Installation & Maintenance Topic and Resource Categories:

Data CentersCabling Standards
Network CableConnectivity Technologies
Network ProtocolsIP Convergence
WirelessDesign, Installation & Testing
Current IssueArchives
Cabling BlogBuyer's Guide