Problem

When someone installs a patch cord in a management system, typically little, if any, attention is paid to patch-cord routing. After all, patching is by its nature a task to be performed quickly. This causes disorganization of the patch-cord management system and decreases the performance of the network by increasing the time needed to identify and rectify faults.

Solution

Establish a simple guideline that will provide the support needed to understand and teach someone how to route patch cords in the most efficient manner possible.

Procedure

1) Divide the equipment rack into two equal vertical sections (i.e., left and right).

2) Route patch cords through horizontal and vertical managers. When routing a patch cord, you must always route it in a path that will eliminate all of the patch-cord slack. If slack is present after your first attempt at routing, you may reroute or apply patch-cord adjusters to eliminate the slack.

3) Routing and patching should be performed in one section at a time. Crossing a section should occur only when you need to eliminate patch-cord slack.

4) If patch-cord slack is present after rerouting, apply adjusters. If the adjuster can be applied as shown in the illustration or within a single section, then route the patch cord appropriately to accomplish this task. Try to avoid crossing a section.

The key to patch-cord routing is to have an adequate number of horizontal and vertical managers in your system and to eliminate slack in each patch cord by using your managers and patch-cord adjusters.

Click here to enlarge image

In the illustration, #1 shows that there is patch-cord slack in the equipment rack. This patch cord should have patch-cord adjusters applied to eliminate slack or, as shown by #2, the patch cord must be rerouted through horizontal and vertical managers to eliminate slack. Note: Trying to reroute slack through managers as in #2 may still result in patch-cord slack. When this occurs, apply patch-cord adjusters to eliminate slack.

Dennis Mazaris, registered communications distribution designer (rcdd), is the principal consultant for PerfectSite (Sterling, VA), a consulting firm specializing in premises cabling management and design.


We Recommend

Skeletons in the telecom closet: The 10 scariest things I've seen this year

The 11 biggest cabling stories of 2011

Free app calculates loss budget

Reference poster dissects 802.11n

Fiber installation courses available online

Counterfeit cable exposed

Making the switch from 62.5- to 50-micron fiber

Telecom grounding and bonding standard published by NECA and BICSI

Free poster highlights 10 fiber-safety rules


Most Popular Articles
Top Blog Posts

TIA sets objectives for 40G over twisted pair

Cancer patients miss surgery due to cable theft

Cable tech finds 500-pound bear in customer’s basement

Nearly-electrocuted copper-cable thief speaks remorsefully

House explosions, captured on video, blamed on cable theft

Modified U.S. Army drone spies on WiFi users

Turn a wiring cabinet into a liquor cabinet


Receive Free E-mail Newsletters from Cabling Installation & Maintenance

Want to hear about more articles like this one? Sign up for our free email newsletters.



Email:

First Name:

Last Name:

Promo Code (optional):

Country:

Available Newsletters:
Cabling News

Data Centers Report

Contractor Report

 


Cabling Installation & Maintenance Topic and Resource Categories:

Data CentersCabling Standards
Network CableConnectivity Technologies
Network ProtocolsIP Convergence
WirelessDesign, Installation & Testing
Current IssueArchives
Cabling BlogBuyer's Guide