Thieves use Google Earth to steal copper cabling

The ubiquitous, freely accessible Google Earth satellite pictorial application was used by thieves to target copper cabling along the side of UK railway lines in a theft that cost authorities £1 million.

The ubiquitous, accessible-to-all Google Earth pictorial application was used by thieves to target copper cabling along the side of UK railway lines in a theft that cost £1 million, as reported by the UK Mail Online.

There are two interesting angles to this story: first, as attested to by evidence of video stills in the aforementioned report, it casts Google Earth in a great light as the largest critical-use IP surveillance application ever; and secondly, as a reminder that theft of precious metal materials by this method is only going to increase, as in another recent case, also in the UK, where thieves used Google Earth to target lead (Pb) roofs on Church of England buildings.

Cabling installation contractors, as always, may take note: “We have seen the significant disruption that metal theft causes to critical national infrastructure throughout the United Kingdom,” commented UK Home Office minister James Brokenshire.“That includes power and transport networks, with the stealing of live copper cable, which has resulted in death and serious injury for people involved.”

Full Story:Thieves use Google Earth to steal copper cabling costing railway companies £1 million (dailymail.co.uk)

Sign up for our eNewsletters
Get the latest news and updates
Little Beaver Inc.
A hydraulic earth drill with a high-torque anchor handle and utility anchor adapter can significantly improve safety for anchor installation.
Enabling a one-person install, the earth drill has several advantages over manually setting drive rods or using anchor crankers.
Creative Composites Group
These Tower Tech XR cooling towers use evaporative cooling to remove heat generated within the data center by IT equipment. Composite cooling towers are more compact and significantly lighter than metal towers. They arrive at a data center site pre-built.
Data center designers shouldn’t sleep on the benefits of fiberglass construction materials.