Case study: DAS system installation

July 19, 2013
Technical case study from Foxcom.

A technical case study from Foxcom outlines details of a recent DAS system installation for the Beit Rubenstein high-rise building in Tel Aviv, Israel. Foxcom set up a complete fiber-based DAS system in Beit Rubenstein to improve existing wireless system performance in the building. A detailed description and analysis of the site installation is provided in the paper.

View/Download the case study.

More analysis: In DAS deployments, business issues are critical

Sponsored Recommendations

Power up your system integration with Pulse Power - the game-changing power delivery system

May 10, 2023
Pulse Power is a novel power delivery system that allows System Integrators to safely provide significant power, over long distances, to remote equipment. It is a Class 4 power...

Network Monitoring- Why Tap Modules?

May 1, 2023
EDGE™ and EDGE8® tap modules enable passive optical tapping of the network while reducing downtime and link loss and increasing rack space utilization and density. Unlike other...

Fiber solutions that drive Equinix performance

Aug. 25, 2023
CommScope and Equinix work hand in hand to provide client connectivity across the globe

The Agile and Efficient Digital Building

May 9, 2023
This ebook explores how intelligent building solutions can help businesses improve network infrastructure management and optimize data center operations in enterprise buildings...