Tutorial: Installing overhead infrastructure in raised-floor applications

Sept. 12, 2013
Leviton tutorial details installation of overhead infrastructure in raised-floor telecom room, data center applications.

The following short (4:27) video provides step-by-step walk-through instructions for installing Leviton's newly launched Overhead Infrastructure Platform in a raised-floor application. The tutorial covers mounting and assembling a single bay of the platform on a raised floor. As asserted by Leviton, the platform "provides a full overhead support for cabling pathways, power, lighting, and other infrastructure. Platforms can carry the load of cables and ladder trays while freeing up rack space by adding patching above cabinets or racks."

Related: Berk-Tek and Leviton announce technology alliance

More: Leviton : 24-fiber connector ‘yellow flags’ are misconceptions


Sponsored Recommendations

Power up your system integration with Pulse Power - the game-changing power delivery system

May 10, 2023
Pulse Power is a novel power delivery system that allows System Integrators to safely provide significant power, over long distances, to remote equipment. It is a Class 4 power...

400G in the Data Center

Aug. 3, 2022
WHATS NEXT FOR THE DATA CENTER: 400G and Beyond

Network Monitoring- Why Tap Modules?

May 1, 2023
EDGE™ and EDGE8® tap modules enable passive optical tapping of the network while reducing downtime and link loss and increasing rack space utilization and density. Unlike other...

The Agile and Efficient Digital Building

May 9, 2023
This ebook explores how intelligent building solutions can help businesses improve network infrastructure management and optimize data center operations in enterprise buildings...