Small cell backhaul installation in 25 seconds

May 16, 2014
Time lapse video from Sub10 Systems.

The following new video from Sub10 Systems shows, in 25 seconds of time lapse footage, a 60 GHz backhaul installation of an 18-cm. x 18-cm. microwave system for 4G and LTE outdoor small cells. Actual installation time: < 60 minutes.

View/Download Sub10's White Paper: 60GHz Small Cell Backhaul for Service Providers (PDF)

Sponsored Recommendations

Power up your system integration with Pulse Power - the game-changing power delivery system

May 10, 2023
Pulse Power is a novel power delivery system that allows System Integrators to safely provide significant power, over long distances, to remote equipment. It is a Class 4 power...

The Agile and Efficient Digital Building

May 9, 2023
This ebook explores how intelligent building solutions can help businesses improve network infrastructure management and optimize data center operations in enterprise buildings...

400G in the Data Center

Aug. 3, 2022
WHATS NEXT FOR THE DATA CENTER: 400G and Beyond

Network Monitoring- Why Tap Modules?

May 1, 2023
EDGE™ and EDGE8® tap modules enable passive optical tapping of the network while reducing downtime and link loss and increasing rack space utilization and density. Unlike other...