Repeat After Me

"Clients should never be allowed to install their own patch cords." - P.L., BICSI RCDD, RTPM, OSP associate project engineer

“Clients should never be allowed to install their own patch cords.” -- P.L., BICSI RCDD, RTPM, OSP associate project engineer

This reader-submitted photo shows what condition gradually befell one of the intermediate distribution frames (IDF) of a large U.S. university system - located, ironically enough, in a closet inside the campuses’ engineering school building.

“For years, the [engineering dept.] was allowed to enter our closets and run their own patch cords to their department switches,” writes P.L., the university’s resident BICSI RCDD, RTPM, OSP associate project engineer. “This photo shows the results of this decision.” In addition to his maxim as quoted above, the technician clarifies, “We recently took back all of our closets in this building, replaced all of the voice/data cable with Category 6A cable, and changed the locks on our doors.”

Sign up for our eNewsletters
Get the latest news and updates
Little Beaver Inc.
A hydraulic earth drill with a high-torque anchor handle and utility anchor adapter can significantly improve safety for anchor installation.
Enabling a one-person install, the earth drill has several advantages over manually setting drive rods or using anchor crankers.
Creative Composites Group
These Tower Tech XR cooling towers use evaporative cooling to remove heat generated within the data center by IT equipment. Composite cooling towers are more compact and significantly lighter than metal towers. They arrive at a data center site pre-built.
Data center designers shouldn’t sleep on the benefits of fiberglass construction materials.