Step 5: Balancing CAPEX and OPEX

Aug. 15, 2013

When selecting the latest IT equipment or method to power or cool the data center, it is important to take an approach that balances total cost to build (CAPEX) versus the total cost of operating the data center (OPEX). For example, it is not wise to select an energy-saving technology without considering the cost to operate and maintain the technology. Following are questions to answer when selecting a technology for the data center:

• What additional training or people will be required to operate the technology?

• What are the costs related to maintenance and upkeep?

• What is the lifespan of the equipment and how does it affect my depreciation expense?

Closely examining CAPEX and OPEX helps to make informed, intelligent choices and if necessary, provides the reasoning for spending more up front to ultimately achieve operational savings.

<< PREV1234 5 67891011NEXT>>

Sponsored Recommendations

Cat 6A Frequently Asked Questions

April 29, 2024
At CommScope we know about network change and the importance of getting it right. Conclusion Category 6A cabling and connectivity.

Revolutionize Your Network with Propel Fiber Modules

Oct. 24, 2023
Propel Fiber Modules are your gateway to the future of connectivity.

Elevate Your Network with Propel High-Density Panels

Oct. 24, 2023
Propel high-density panels are designed to adapt and grow as your needs change.

Constellation™ - Explore power and data products

Oct. 24, 2023
Discover the Essentials for Building Your Power and Data System!