Tutorial: Installing overhead infrastructure in raised-floor applications

Sept. 12, 2013
Leviton tutorial details installation of overhead infrastructure in raised-floor telecom room, data center applications.

The following short (4:27) video provides step-by-step walk-through instructions for installing Leviton's newly launched Overhead Infrastructure Platform in a raised-floor application. The tutorial covers mounting and assembling a single bay of the platform on a raised floor. As asserted by Leviton, the platform "provides a full overhead support for cabling pathways, power, lighting, and other infrastructure. Platforms can carry the load of cables and ladder trays while freeing up rack space by adding patching above cabinets or racks."

Related: Berk-Tek and Leviton announce technology alliance

More: Leviton : 24-fiber connector ‘yellow flags’ are misconceptions


Sponsored Recommendations

Data Center

Revised TIA-942 Data Center Standard Approved for Publication

Feb. 12, 2024
The “C” revision of TIA-942 includes requirements for fiber connectivity and cabinet widths, as well as guidelines for thermal management and humidity levels.
Data Center

AFL Hyperscale Rebrands

Feb. 6, 2024
AFL Hyperscale rebranding to AFL represents the company unifying itself to further meet both global and customer demands.