Preparing data center physical infrastructure for consolidation

New white paper from APC-Schneider Electric.

The consolidation of one or more data centers into an existing data center is an increasingly common occurrence. A new white paper from APC-Schneider Electric addresses the topic of preparing the physical infrastructure of receiving data centers for consolidation.

The company notes that consolidation into an existing data center is often considered impractical because existing physical infrastructure is not considered compatible with current requirements, or the risk of disruption of the existing data center is not acceptable. However, a growing number of consolidation efforts have found success consolidating into an existing data center using the effective approach described in the white paper.

Authored by Neil Rasmussen, the document gives examples of what is becoming a standard architecture for preparing the physical infrastructure in the receiving data center. According to APC-Schneider Electric, the outlined approach may allow for shorter timelines and higher efficiency, while eliminating many of the difficulties and complexities often experienced with consolidation projects.

Download the white paper here.

Sign up for our eNewsletters
Get the latest news and updates
Little Beaver Inc.
A hydraulic earth drill with a high-torque anchor handle and utility anchor adapter can significantly improve safety for anchor installation.
Enabling a one-person install, the earth drill has several advantages over manually setting drive rods or using anchor crankers.
Creative Composites Group
These Tower Tech XR cooling towers use evaporative cooling to remove heat generated within the data center by IT equipment. Composite cooling towers are more compact and significantly lighter than metal towers. They arrive at a data center site pre-built.
Data center designers shouldn’t sleep on the benefits of fiberglass construction materials.