INDUSTRY SPOTLIGHT

Jan. 1, 1995

Comlink focuses on continuous quality improvement

Click here to enlarge image

When you have installed 10,000 feet of cable:

How much copper did you waste?

How much Teflon did you waste when you cut off the ends or when you replaced faulty runs?

How much of the installation came out 100% within specification?

To determine how your technician performed, ask the customer:

Before leaving, did the technician make you feel comfortable that everything was done?

Was all the work completed when the technician left?

Were the ceiling tiles replaced where the cable was run?

Did the technician clean up any debris that fell on the floor?

Sponsored Recommendations

Global support of Copper networks

May 29, 2024
CommScope designs, manufactures, installs and supports networks around the world. Take a look at CommScope’s copper operations, the products we support, our manufacturing locations...

Cat 6A: The Amazingly Versatile, Capable Twisted Pair Solution

May 29, 2024
While its impossible to truly future-proof a network against challenges that dont yet exist enterprise networks can tilt the odds in their favor as they adapt to new application...

Cat 6A Frequently Asked Questions

April 29, 2024
At CommScope we know about network change and the importance of getting it right. Conclusion Category 6A cabling and connectivity.

Revolutionize Your Network with Propel Fiber Modules

Oct. 24, 2023
Four sizes of interchangeable Propel fiber modules provide the breadth of capabilities for virtually any configuration.