Reeling it in

Sept. 26, 2013

Taken from different angles of the same space, these final images showcase the results of 144 total work hours invested in cleaning up a mess that festered for five or six years. As a closing observation, Dan Page noted, "It is truly amazing how MDFs/IDFs can get away from teams." Dan and the rest of the crew reeled this one back in.

<< PREV123 4 See our next slide show: 'Cabling for the Zombie Apocalypse'> >

Sponsored Recommendations

What you need to know about 6A cabling

Aug. 3, 2022
Did you know that Category 6A cable is the best choice for structured cabling?

Fiber solutions that drive Equinix performance

Aug. 25, 2023
CommScope and Equinix work hand in hand to provide client connectivity across the globe

Smart Building Smart Cabling Case Study

Aug. 3, 2022
Located in the Shenzhen Nanshan Science and Technology Park is a building known as the citys landmark for new science and technology the Tencent Binhai Building (TBB).

Power up your system integration with Pulse Power - the game-changing power delivery system

May 10, 2023
Pulse Power is a novel power delivery system that allows System Integrators to safely provide significant power, over long distances, to remote equipment. It is a Class 4 power...