Easy open/short testing on structured wiring

March 1, 2000
You've pulled RG-6/U quad-shield coaxial cable and Category 5 unshielded twisted-pair (UTP) "dark" for future expansion needs and would like to know if any defects (opens/shorts) occurred during the installation process.

Rob Jewson, Superior Essex

problem

You've pulled RG-6/U quad-shield coaxial cable and Category 5 unshielded twisted-pair (UTP) "dark" for future expansion needs and would like to know if any defects (opens/shorts) occurred during the installation process.

solution

Use a Cat 5/coaxial-cable analyzer with time-domain- reflectometer (TDR) capability to perform a "down-and-dirty" open/short test before the drywall is hung.

procedure

Find out the approximate run length for each cable pulled. Connectorize the distribution end of each cable run using F-connectors and RJ-45 plugs, wired in compliance with the TIA/EIA-568A or TIA/EIA-568B standard. This arrangement will leave an "open" condition on the outlet end of each cable.

Testing Category 5 UTP cable:

  1. Set up the cable analyzer to test Cat 5 UTP "Basic Link," and select the TDR test mode.
  2. Plug in the connectorized distribution end of any Cat 5 UTP cable pulled "dark," and press the analyzer's test button. The results will show the pair combinations (1,2; 3,6; 4,5; and 7,8), distance/length of the TDR reading, and a peak percentage that's positive or negative for each pair combination. A positive peak percentage indicates an "open" situation, while a negative peak percentage indicates a "short."
Test results will show one of the following:
  • A distance/length reading for all pair combinations that corresponds (within a few feet) to the actual length of the cable and a peak percentage that is positive for each pair combination. This condition would be considered a "pass" because you should see an "open" at the outlet end of the cable.
  • A distance/length reading for any pair combination that does not correspond (within a few feet) to the actual length of the cable and a peak percentage that's positive for each pair combination. This scenario would be considered a "fail" condition, meaning one or more of the cable pairs have been severed at the distance indicated on the analyzer, measured from the point where the cable analyzer is connected.
  • A distance/length reading for any pair combination that does not correspond (within a few feet) to the actual length of the cable and a peak percentage that's negative. This scenario would be considered a "fail" condition, indicating a "short" at the distance indicated on the analyzer, measured from the point where the cable analyzer is connected. The "fail" is probably due to a nail or staple penetrating the cable and shorting the pair.
  1. Continue testing each Cat 5 UTP run until all "dark" cables have been tested, troubleshooting any failures and replacing cable as necessary.

Testing RG-6/U coaxial cable:

Use the same procedure used for Cat 5 UTP to test all your RG-6/U coaxial cable, except set up the cable analyzer accordingly. Information on the network analyzer will look very similar.

Rob Jewson, registered communications distribution designer (RCDD), of Fort Wayne, IN, is senior manufacturing engineer for Superior Essex (Atlanta).

Click here to enlarge image

In this example, a "pass" condition was achieved, as you should see an "open" at the outlet end of the cable.

Click here to enlarge image

This example of a "fail" condition means one or more cables have been severed.

Click here to enlarge image

A short was caused by a protruding staple, resulting in another "fail" condition.

Sponsored Recommendations

imVision® - Industry's Leading Automated Infrastructure Management (AIM) Solution

May 29, 2024
It's hard to manage what you can't see. Read more about how you can get visiability into your connected environment.

Global support of Copper networks

May 29, 2024
CommScope designs, manufactures, installs and supports networks around the world. Take a look at CommScope’s copper operations, the products we support, our manufacturing locations...

Adapt to higher fiber counts

May 29, 2024
Learn more on how new innovations help Data Centers adapt to higher fiber counts.

Going the Distance with Copper

May 29, 2024
CommScopes newest SYSTIMAX 2.0 copper solution is ready to run the distanceand then some.