Send us your most ‘Must See’ cabling and wireless installer photos

As in, “must be seen to be believed."    

Image via theregister.co.uk/2015/03/31/cable_disasters/

Open call to all structured cabling and wireless technicians and managers in the ICT arena: Next time you’re on-site -- and confronted with "a sight" -- whether of cabling chaos or its orderly solution -- we invite you to snap a pic and send it to us. Send your images to [email protected] and we’ll feature them in our homepage ‘Must See Photos’ gallery, as well as in our e-newsletters.

Sign up for our eNewsletters
Get the latest news and updates
Little Beaver Inc.
A hydraulic earth drill with a high-torque anchor handle and utility anchor adapter can significantly improve safety for anchor installation.
Enabling a one-person install, the earth drill has several advantages over manually setting drive rods or using anchor crankers.
Creative Composites Group
These Tower Tech XR cooling towers use evaporative cooling to remove heat generated within the data center by IT equipment. Composite cooling towers are more compact and significantly lighter than metal towers. They arrive at a data center site pre-built.
Data center designers shouldn’t sleep on the benefits of fiberglass construction materials.