U.S. Probation Office bidding out 300+-drop Cat 6 cabling project

April 26, 2012
Bids are due May 4 for the installation job that specifies 302 Category 6 drops across four office locations.

The United States Probation Office, Central District of California has issued a request for quote (RFQ) for the installation of a total of 302 drops of plenum-rated Category 6 cable in four of its offices. Those offices are located in Inglewood, West Covina, Lancaster and Santa Fe Springs. The RFQ was issued on April 23 and quotes are due by 4pm PDT on Friday, May 4.

The RFQ's "Special Requirements" section includes the following: All work must be performed by licensed and bonded Southern California companies and personnel. All works must be done by workers competent in the field for which they are sent to work in. Vendor must possess at least 5-10 years experience with data cabling and telecommunications. Vendor must receive authorization prior to the start of work to use subcontractors.

The project will involve installing Category 6 cabling to: USPO (United States Probation Officer) offices, SUSPO (Supervising United States Probation Officer) offices, cubicles/workstations, printer/mail areas, as well as fax lines and modem lines in each of the four offices.

Quotes should be sent to Helen Cheung, procurement and facilities manager. Ms. Cheung can be reached via email here.

You can find out more detail about the project and download the RFQ at the FBO website here.

Sponsored Recommendations

March 28, 2025
Bringing University of Tennesee's campus up to speed.
March 28, 2025
CommScope’s FiberGuide® Design Pro helps you design a complete fiber raceway for your data center or central office using 2D and 3D technology. This video guides you through the...
March 28, 2025
CommScope and Equinix work hand in hand to provide client connectivity across the globe