Regular team meetings should occur during construction and commissioning. Invite the various leaders and supervisors of all involved trades to these meetings. It is critical that the design team attends these meetings. Detailed status and problem reporting should occur to keep everyone apprised of the project, coordinate overlapping trades and provide a team atmosphere for the project. During this phase, be careful of scope creep and changes to the design. The same holistic principles should take place to resolve any design problems and construction conflicts that arise.