Step 10: Constructing and Commissioning

Aug. 15, 2013

Regular team meetings should occur during construction and commissioning. Invite the various leaders and supervisors of all involved trades to these meetings. It is critical that the design team attends these meetings. Detailed status and problem reporting should occur to keep everyone apprised of the project, coordinate overlapping trades and provide a team atmosphere for the project. During this phase, be careful of scope creep and changes to the design. The same holistic principles should take place to resolve any design problems and construction conflicts that arise.

<< PREV123456789 10 11NEXT>>

Sponsored Recommendations

What you need to know about 6A cabling

Aug. 3, 2022
Did you know that Category 6A cable is the best choice for structured cabling?

Fiber solutions that drive Equinix performance

Aug. 25, 2023
CommScope and Equinix work hand in hand to provide client connectivity across the globe

Smart Building Smart Cabling Case Study

Aug. 3, 2022
Located in the Shenzhen Nanshan Science and Technology Park is a building known as the citys landmark for new science and technology the Tencent Binhai Building (TBB).

Cat 6A Hard Facts

Aug. 3, 2022
At CommScope we know about network change and the importance of getting it right. Conclusion Category 6A cabling and connectivity.