Skip to main content
Save the Date
for ISE EXPO 2027, August 24-26
Data Center
Cable
Design Install
Testing
Wireless
Sections
Data Center
Cable
Design Install
Testing
Wireless
Standards
Connectivity
IP AV
Special
Innovators Recognition
Technical Papers and White Papers
Innovators Awards Entry Info
Webinars
Magazine
Contact
About Our Coverage
Contact Us
Newsletter Subscription
Privacy Policy
Advertise With Us
Affiliated Brands
DATA CENTER FRONTIER
ISE
LIGHTWAVE
DIGITAL INFRASTRUCTURE GROUP
Follow us on
http://www.facebook.com/pages/Cabling-Installation-and-Maintenance/298118662118
https://www.instagram.com/cim_magazine/
https://www.linkedin.com/company/3962332
http://twitter.com/CABLINGMAG
Home
>
Back Issues
>
Cabling Installation & Maintenance
>
Volume 27, Issue 8
Volume 27, Issue 8
Volume 27, Issue 8 cover image
Volume 27, Issue 8
Digital
Edition
Archives
Amy Hacker Hero
Cable
Selecting the right cabling infrastructure for AV applications
Sept. 12, 2019
Viavi
Innovation Awards
Cabling Innovators Spotlight August 2019
Sept. 12, 2019
Left to right are Glenn Sexton, Principal Consultant; Diane Forbes, Chief Operating Officer; and Jeff Cazel, Chief Executive Officer of NIS Consulting. The trio brings a wide breadth of professional experience to NIS's clientele. Sexton and Forbes have dedicated significant time and resources to the TIA's standards-development activities.
Standards
Setting the standard, from the meeting room to the classroom to the boardroom
Sept. 12, 2019
Shown here is a simplified two-row, 32-fiber auto-analysis test result. Indicated by the blue arrow, Fiber 5 is a marginal fiber endface. The auto-analysis grid shows a passing assessment of Fiber 5 half the time.
Testing
Multifiber optical connector inspection: The auto-analysis repeatability challenge
Sept. 12, 2019
Circuitry produced by AEM enables testing of single-pair cabling. The single-pair cabling construction shown under test here is a prototype developed by Panduit.
Cable
Standards under development for single-pair cabling and transmission
Sept. 12, 2019
More content from Volume 27, Issue 8
Advanced, high-wattage technologies require properly spaced, smaller cable bundles to avoid excessive heat accumulation. Cable managers with a central track system allow cable bundles to be properly spaced and fully supported precisely where needed.
Data Center
Preparing for the edge? Your telecom room needs a makeover
More sophisticated than ever, telecommunications rooms are venturing into new locations and may need a makeover.
Sept. 12, 2019
Multitenant data center segments include outside plant cabling (1), a meet-me room (2), the main distribution area (3), and caged areas (4).
Data Center
How to cable a multi-tenant data center
Flexible solutions are essential, as MTDC cabling includes outside plant, a meet-me room, main distribution area and caged area.
Sept. 12, 2019